Medical WAGD Vacuum System Collaboration and Installation…

AES Group, Inc, and a local Northern California Hospital's engineering team recently collaborated on a comprehensive medical vacuum system solution that provides the hospital the reliability they desire. Our collaborative approach allowed discussions and reviews of the features and benefits of different medical vacuum technology options and the hospital chose...

Powerex Model CVPTD0504A Dedicated WAGD Medical Vacuum System

AES Group, Inc. recently provided installation of a (N) Powerex Model CVPTD0504A Dedicated WAGD Medical Vacuum System to a local Northern California Hospital. The AES-Powerex WAGD Medical Vacuum System included Powerex's Premium NFPA HMI Control Panel with BacNet Communication Protocol, Variable Frequency Drive Pump Control, and Oxygen Assured Vacuum Pumps...

Stanford University SOM Dekker Laboratory Vacuum System Installation Project

AES Group, Inc. has been fortunate to complete numerous equipment installations/construction projects at Stanford University throughout the last two decades. This installation, of Dekker Laboratory Vacuum System Model AES-VMX0083MA2-00-DS with a Solberg HV Series Filter, was completed at the School of Medicine Fairchild facility. The project included installation of a...

“All things are created twice; first mentally; then physically. The key to creativity is, to begin with, the end in mind, with a vision and a blueprint of the desired result.” Stephen Covey

November 5th is Project Management Day and AES Group gives kuddos to our project managers as well as our entire construction team for their dedication to go above and beyond for our customers. AES Group has completed construction projects throughout Bay Area hospitals - from Marin Health Medical Center, Stanford...