Rental Equipment Nationwide…

A large industrial machine wrapped in green plastic sits on a wooden pallet jack in a warehouse with shelves, boxes, and equipment in the background.

AES Group has a myriad of options to help you, whether in an emergency or as a temporary solution, to keep your systems running with the least amount of down time or interruptions. We recently received a call from Sunbelt Rentals that was in urgent need of a temporary Medical Air System for a hospital […]

O&M’s, Parts Breakdowns and Spec Sheets… Oh my!

Two binders labeled "OPERATIONS MANUAL" and "MAINTENANCE MANUAL" with "AES Group, Inc. Sales · Construction · Service" printed on the sides. A blurred hand is holding a pen in the background.

It never fails, when you need them the most, manuals seem to disappear. Don’t dismay, have no fear, AES Group is here and we can provide those missing O&M Manuals and reference documents.  In our Shop , for the parts and equipment listed, we offer all available information. We can also find most manuals and […]

Project Highlight – Stanford School of Medicine Beckman Mechanical Room Laboratory Air System Replacement

Medical Laboratory Duplex 50HP Rotary Tooth with VFD and Duplex Desiccant Dryers

Another completed project by our awesome AES Group team. Provide and Install Temporary Laboratory Air Compressor System: Powerex System Model MSET2006-SPL: Triplex 20HP Enclosed Scroll w/Desiccant Dryer System 183 SCFM @ 100 PSIG Rig and set temporary laboratory air compressor system. Provide and install temporary breaker in spare bucket/breaker location in Panel BA. Complete electrical […]

‘Twas Three Days Before Christmas…

Santa Claus rides a sleigh pulled by eight reindeer, flying over a snowy landscape with a house below. The sleigh is filled with toys and a decorated Christmas tree. A company logo appears at the top of the image.

Twas three days before Christmas, when all through the shop not a technician was stirring, nor one was in sight. They were all out on projects, to get things done, with hopes in their minds to have a day off soon. When all of a sudden, a ring came from the phone, to request AES […]

Powerex Model CVPTD0504A Dedicated WAGD Medical Vacuum System

Industrial room with a white Powerex control panel, mounted pipes, electrical conduits, and machinery in the background. Panel displays labeled buttons, switches, and a small screen. Exposed ceiling and concrete floor visible.

AES Group, Inc. recently provided installation of a (N) Powerex Model CVPTD0504A Dedicated WAGD Medical Vacuum System to a local Northern California Hospital. The AES-Powerex WAGD Medical Vacuum System included Powerex’s Premium NFPA HMI Control Panel with BacNet Communication Protocol, Variable Frequency Drive Pump Control, and Oxygen Assured Vacuum Pumps – Prepared for Use in […]

BeaconMedaes Laboratory Compressed Air System Desiccant Dryer Retrofit Upgrade

Industrial gas separation equipment with labeled sections “A” and “B,” multiple pipes, gauges, valves, and a tall white cylindrical tank on the left, situated outdoors under a metal canopy.

AES Group, Inc.’s Service Team, coordinated and scheduled a Saturday laboratory compressed air system shutdown, to retrofit-upgrade an existing BeaconMedaes Laboratory Desiccant Dryer that was originally installed in 2004. Our Service Team, appreciates the opportunity and trust, working with our  long time customers. Our customers include many of the leading healthcare and biotechnology companies throughout […]

Infectious Control Compliance and Planning….

A hospital hallway with a door and surrounding wall sealed off by plastic sheeting and tape, labeled "AES GROUP INC." Warning and construction signs are posted, indicating restricted access for medical or construction reasons.

AES Group, Inc. has continued to work hard meeting and setting industry standards for PCRA/ICRA compliance. Partnering with leading Infectious Control Prevention hospital facility teams has allowed us to adopt best practice protocols to identify potential healthcare construction risks and create mitigation strategies to reduce or eliminate them. AES Group understands and is knowledgeable about […]

0