More Projects
Sutter Roseville “Cart Wash and Ultra Sonic Cleaner” CSPD
December 16, 2021
UC Berkeley Bakar Bioenginuity HUB Laboratory Vacuum System
October 19, 2021
Stanford D&T Mechanical Room Control Air Compressor System Upgrade
September 8, 2021
UCSF 23A Dekker Medical-Laboratory Vacuum System
January 27, 2021
Stanford Valley Care Medical Air Dryer Upgrade Project
December 1, 2020
Genesis North Tower Laboratory Vacuum System Upgrade
September 9, 2020
Stanford School of Medicine Beckman Mechanical Room Laboratory Air System Replacement






Industry: Hospitals and Healthcare, Laboratories
Type: Construction, Equipment
Description
Scope of Work
- Provide and Install Temporary Laboratory Air Compressor System:
- Powerex System Model MSET2006-SPL: Triplex 20HP Enclosed Scroll w/Desiccant Dryer System
- 183 SCFM @ 100 PSIG
- Rig and set temporary laboratory air compressor system.
- Provide and install temporary breaker in spare bucket/breaker location in Panel BA.
- Complete electrical POC
- Complete plumbing POC
- Install both temporary and (N) laboratory air system isolation valves.
- Startup and Test temporary laboratory air system.
- Provide and install (N) Powerex Rotary Tooth Air Compressor System (Model AES-MDRCO507-VFD)
- Duplex 50HP Powerex Rotary Tooth Laboratory Air System.
- 67-207 SCFM @ 100 PSIG each compressor.
- Specification and data sheets attached.
- Complete electrical POC including:
- 120 VAC power connection to master control panel
- 3 Phase main power to each compressor unit, with appropriate branch circuit protection and service disconnect.
- Power wire for air receiver automatic drain to be connected to master control panel.
- Control signal wiring between master panel and each compressor unit including (2) (N) electrical buckets and breakers.
- Complete plumbing POC
- Interconnecting piping connections between each compressor, receiver tank, and dryer skid.
- Final laboratory air system POC.
- System test
- Demo and remove temporary laboratory air system.
Description
Scope of Work
- Provide and Install Temporary Laboratory Air Compressor System:
- Powerex System Model MSET2006-SPL: Triplex 20HP Enclosed Scroll w/Desiccant Dryer System
- 183 SCFM @ 100 PSIG
- Rig and set temporary laboratory air compressor system.
- Provide and install temporary breaker in spare bucket/breaker location in Panel BA.
- Complete electrical POC
- Complete plumbing POC
- Install both temporary and (N) laboratory air system isolation valves.
- Startup and Test temporary laboratory air system.
- Provide and install (N) Powerex Rotary Tooth Air Compressor System (Model AES-MDRCO507-VFD)
- Duplex 50HP Powerex Rotary Tooth Laboratory Air System.
- 67-207 SCFM @ 100 PSIG each compressor.
- Specification and data sheets attached.
- Complete electrical POC including:
- 120 VAC power connection to master control panel
- 3 Phase main power to each compressor unit, with appropriate branch circuit protection and service disconnect.
- Power wire for air receiver automatic drain to be connected to master control panel.
- Control signal wiring between master panel and each compressor unit including (2) (N) electrical buckets and breakers.
- Complete plumbing POC
- Interconnecting piping connections between each compressor, receiver tank, and dryer skid.
- Final laboratory air system POC.
- System test
- Demo and remove temporary laboratory air system.