Medical WAGD Vacuum System Collaboration and Installation…

AES Group, Inc, and a local Northern California Hospital’s engineering team recently collaborated on a comprehensive medical vacuum system solution that provides the hospital the reliability they desire. Our collaborative approach allowed discussions and reviews of the features and benefits of different medical vacuum technology options and the hospital chose the following systems: AES-Dekker VMAX […]
WE STRIVE FOR EXCELLENCE AS A CUSTOMER-DRIVEN SALES, CONSTRUCTION AND SERVICE RESOURCE

That is our mission statement here at AES Group, Inc. and we appreciate when our hard work is recognized and shared by our valued customers. AES Group not only sells equipment systems & parts (check out our shop) and full range of services for equipment, but we also provide construction services. Our Healthcare Construction Services […]
Powerex Model CVPTD0504A Dedicated WAGD Medical Vacuum System

AES Group, Inc. recently provided installation of a (N) Powerex Model CVPTD0504A Dedicated WAGD Medical Vacuum System to a local Northern California Hospital. The AES-Powerex WAGD Medical Vacuum System included Powerex’s Premium NFPA HMI Control Panel with BacNet Communication Protocol, Variable Frequency Drive Pump Control, and Oxygen Assured Vacuum Pumps – Prepared for Use in […]
Stanford University SOM Dekker Laboratory Vacuum System Installation Project

AES Group, Inc. has been fortunate to complete numerous equipment installations/construction projects at Stanford University throughout the last two decades. This installation, of Dekker Laboratory Vacuum System Model AES-VMX0083MA2-00-DS with a Solberg HV Series Filter, was completed at the School of Medicine Fairchild facility. The project included installation of a temporary Dekker VMX0103MA1 Lab Vac […]
Dekker Oil-Sealed Liquid Ring VMAX with Solberg Inlet Filtration

AES Group, Inc. offers many options for Planned or Emergency, temporary medical and laboratory vacuum pumps and systems. Our service and construction teams are experienced in providing the required support to get our customers systems up and operating. We recently had an opportunity to put our team to the test, mobilizing and installing a temporary […]
Becker Oil-Less Rotary Vane Vacuum Pumps with Solberg Inlet Filtration

AES Group Inc. recently had the opportunity, to work with a custom furniture manufacturer, installing Becker oil-less vacuum pumps on their new router tables. Solberg ST Series “See-Through” Inlet Filters were also installed for additional vacuum pump protection. Becker oil-less dry vane pumps have become one of the standards in the router industry. Becker has […]
“All things are created twice; first mentally; then physically. The key to creativity is, to begin with, the end in mind, with a vision and a blueprint of the desired result.” Stephen Covey
November 5th is Project Management Day and AES Group gives kuddos to our project managers as well as our entire construction team for their dedication to go above and beyond for our customers. AES Group has completed construction projects throughout Bay Area hospitals – from Marin Health Medical Center, Stanford Hospitals and UCSF to name […]