System Highlight – Powerex Medical Laboratory Duplex 50HP Rotary Tooth with VFD and Duplex Desiccant Dryers

Description: Powerex Medical Laboratory Duplex 50HP Rotary Tooth with VFD and Duplex Desiccant Dryers Spec Info: 67-207 SCFM @ 100 PSIG Powerex Duplex 50HP Rotary Tooth Med Lab Air System MDRC0507 VFD Specification Powerex MDRC0507 VFD Sample Submittal Powerex Med Lab Air System MDRC0507 VFD D1 Drawing Take a look at our Engineering Page for […]
Project Highlight – Stanford School of Medicine Beckman Mechanical Room Laboratory Air System Replacement

Another completed project by our awesome AES Group team. Provide and Install Temporary Laboratory Air Compressor System: Powerex System Model MSET2006-SPL: Triplex 20HP Enclosed Scroll w/Desiccant Dryer System 183 SCFM @ 100 PSIG Rig and set temporary laboratory air compressor system. Provide and install temporary breaker in spare bucket/breaker location in Panel BA. Complete electrical […]
Sutter Roseville “Cart Wash and Ultra Sonic Cleaner” CSPD

AES Group recently installed the following equipment: BASE MODEL NUMBER: Powerex LSD0754 SYSTEM CAPACITY: 46.2 SCFM @ 100 PSIG HORSEPOWER: 15 HP Total RECEIVER SIZE/CONFIGURATION: 120 Gal./Vertical ELECTRICAL: 208/230/460V, 3PH, 60Hz GENERAL DESCRIPTION The Laboratory Scroll System is a skid mounted design consisting […]
Hospital Mechanical Room – Kaeser Control Air Compressor System Maintenance Upgrade

AES Group recently completed the following scope of work at a local Northern California Hospital: Provide and Install (2) (N) Kaeser “Air Center” SK 15 Rotary Screw Compressors 71 CFM @ 100 PSIG Each to Match Existing, 460V, 3 Phase, 60 Hz, 67 dB(A) 5 Gallon Air Receiver with Auto Receiver Tank Drain Built-In Refrigerated […]
Stanford Fairchild Laboratory Compressed Air System Upgrade

AES Group, Inc. had the opportunity to upgrade the (E) Powerex 20HP Enclosed Scroll Model SEQ200740AJ, installed in 2011, with a (N) Powerex 40HP Enclosed Scroll Model EEO4007-HP. System Benefits Increased system capacity. Installed cross connection allowed the facility to support separate Lab Buildings from a central location for increased overall system reliability. Powerex High […]
BeaconMedaes Medical Air Dryer Upgrade Project
Highlighting a recent installation project of a BeaconMedaes Medical Air Dryer. SCOPE OF WORK (N) Medical Air Dryer Installation: Provide and Install (N) Medical Air Dryer including: (1) (N) BeaconMedaes Duplex Desiccant Medical Air Dryer Model:LDD055D-DR Lifeline Dryer BeaconMedaes P/N 410700652 55 CFM with Dewpoint Monitor for Purge Control, NO CO Monitor (E) to Remain […]
(N) Beaconmedaes Medical Air System Replacement – OSHPD Project

AES Group, Inc. installation of a (N) Beaconmedaes Medical Air System at a local Bay Area Medical Center. This project included installation of a temporary medical air system, while demolition and removal of existing system was completed. Rigging and seismic anchorage of the new Beaconmedaes Medical Air System and Control Panel, a SAS 10Q-200V-QCDZ Quadruplex […]
January 13th is Sticker Day! Let’s Celebrate…

In honor of R. Stanton Avery, who was born on this day in 1907, Sticker Day was created. Avery, a rags to riches entrepreneur, created the first commercially self-sticking, peel-off labels in 1935. Though in the 1880’s European merchants were the first to stick labels to their products, using a gum paste hence ‘stickers’, to […]
Stanford Valley Care Medical Air Dryer Upgrade Project
Highlighting a recent installation project of a BeaconMedaes Medical Air Dryer. SCOPE OF WORK (N) Medical Air Dryer Installation: Provide and Install (N) Medical Air Dryer including: (1) (N) BeaconMedaes Duplex Desiccant Medical Air Dryer Model:LDD055D-DR Lifeline Dryer BeaconMedaes P/N 410700652 55 CFM with Dewpoint Monitor for Purge Control, NO CO Monitor (E) to Remain […]
(N) BeaconMedaes Medical Air System Replacement Project – Northern California OSHPD Project