More Projects
Sutter Roseville “Cart Wash and Ultra Sonic Cleaner” CSPD
December 16, 2021
UC Berkeley Bakar Bioenginuity HUB Laboratory Vacuum System
October 19, 2021
Stanford D&T Mechanical Room Control Air Compressor System Upgrade
September 8, 2021
UCSF 23A Dekker Medical-Laboratory Vacuum System
January 27, 2021
Stanford Valley Care Medical Air Dryer Upgrade Project
December 1, 2020
Genesis North Tower Laboratory Vacuum System Upgrade
September 9, 2020
UCSF Medical Center Long Hospital Diesel Fuel Tank Fire Hazard Assessment





Industry: Hospitals and Healthcare
Type: Construction
Description
Scope of Work
Installation of a foam fire suppression system at the Long Hospital loading deck. Work included modifications of the room, connection to sprinkler lines and connection to existing alarm system.
Description
Scope of Work
Installation of a foam fire suppression system at the Long Hospital loading deck. Work included modifications of the room, connection to sprinkler lines and connection to existing alarm system.